Manufacturer: Okuma
Exchange: Non-inventory. Call or email for rebuild options
Choosing us to rebuild your Okuma motor type VAC-YMB11/7.5 ensures that it will first be carefully evaluated to determine if it is faulty.
After disassembly and cleaning, the windings will be checked with a digital surge tester, and DC hi-pot. Critical mechanical dimensions will be measured with micrometers, and all test results become part of the permanent record of the motor in our database.
If the motor winding has failed, the old winding will be carefully reverse engineered before being stripped and rewound according to our demanding winding process.
Worn mechanical components will be fabricated or refurbished by our expert machinists. Our machine shop is fully equipped with lathes, mills, and precision grinding equipment.
Rotating components will be precision balanced in our balancing department on one of our Schenck Trebel hard bearing balancing machines.
New bearings, seals, and any other required parts will be installed during assembly, and the correct alignment of the encoder will be verified. Mechanical assembly tolerances such as shaft and flange runout will be checked and confirmed to be within factory tolerances.
Finally the motor will be subjected to our thorough test protocol, checked for excessive noise or temperature, and the vibration levels recorded.
All test data becomes part of our database, and a link to the final service report will be emailed to you upon request.